News
23.09.2009 15:58 Age: 15 yrs
Jason-1 schedule to be switch on on Friday 25
Category: News of the other missions, Operational news
After the safehold mode on 2009/09/15, and after investigations, Jason-1 is scheduled to be switch on on Friday 2009/09/25 (Poseidon-2 at 10:48, and JMR at 12:44 UT).
Investigation showed, in particular, no problem on the reaction wheels. IGDR data should not be available before Monday, 28.
After the safehold mode on 2009/09/15, and after investigations, Jason-1 is scheduled to be switch on on Friday 2009/09/25 (Poseidon-2 at 10:48, and JMR at 12:44 UT).
Investigation showed, in particular, no problem on the reaction wheels. IGDR data should not be available before Monday, 28.