News
15.05.2009 09:09 Age: 16 yrs
The DEM was successfully uploaded on OSTM/Jason-2
Category: News of the Jason-2 mission
The DEM upload was finished the 13th of May around 13:15 UTC, and the altimeter Poseidon-3 was successfully restarted. The system will experience no more data loss due to this uploading, and the DEM assessment is currently in progress by the experts.
The DEM upload was finished the 13th of May around 13:15 UTC, and the altimeter Poseidon-3 was successfully restarted. The system will experience no more data loss due to this uploading, and the DEM assessment is currently in progress by the experts.
<link fileadmin images news mod_actus pointsmanquants_eo_j2_21684.png download> |
Missing measurements for the altimeter Poseidon-3 on Jason-2 during the DEM upload from the 2009/05/11 12:00 UTC to 2009/05/13 13:15 UTC. Measurements were particularly missing over the "visibility circles" of the Jason-2 ground stations: Usingen (USG), Wallops (WCDAS), and Fairbanks (FCDAS). Credits Ssalto/Duacs. |
For the record:
- <link internal-link>The Poseidon-3 altimeter equipped with a DEM
- News of the Jason-2 mission: <link http: www.aviso.oceanobs.com en news-storage news-detail _top external-link-new-window>Interruption of OSTM/Jason-2 altimetry data (2009/05/11)