Operational News
Operational news about Ssalto and Duacs processing system.
02.09.2016 [Jason-3] integration as a new reference mission in Ssalto/Duacs
The new reference mission Jason-3 will be integrated in the Ssalto/Duacs multimission system on September 13, 2016. [more]
23.08.2016 [Saral] reintegrated in the Ssalto/Duacs system
Due to an issue on the processing of the Saral/AltiKa drifting orbit, the mission was temporary deactivated in the Ssalto/Duacs system since 2016/08/09. Today the Saral/Altika is reintegrated in the processing chain. [more]
16.08.2016 [Saral] temporary deactivated in the Ssalto/Duacs system (ADT and MADT production impacted)
Due to an issue on the processing of the Saral/AltiKa drifting orbit, the mission is temporary deactivated in the Ssalto/Duacs system.[more]
25.07.2016 Temporary unavailability of the CNES ftp server on July 26, 2016
For maintenance reason, the Cnes ftp server (ftp://avisoftp.cnes.fr/AVISO/pub) is unavailable on July 26, 2016 between 6:00 and 8:00 UTC. We apologize for the inconvenience.
25.07.2016 [ENVISAT] New POE Orbit files for GDR-E available
All Precise Orbit Determination files version GDR-E for the entire mission are now reprocessed and available.[more]
13.07.2016 Temporary interruption of the Online Data Extraction Service (ODES)
For maintenance reasons, the Online Data Extraction Service (ODES) will be unavailable for a few days.[more]
29.06.2016 [Saral] A new phase with a drifting orbit
SARAL/AltiKa will leave its repetitive orbit by beginning a new phase named "Saral Drifting Phase", “SARAL-DP” from Monday 4 July. The data processing as well as data latency are unchanged.[more]
16.06.2016 Live Access Server (LAS) temporarily interrupted on 18th June
For maintenance reasons, the Live Access Server will be temporarily interrupted on Saturday, 18th June, 2016 from 6:00 to 13:00 UTC Further information about this tool. We apologize for the inconvenience.[more]
10.05.2016 [Jason-1] Jason-1 Version E GDR Release Notice
We are pleased to announce that reprocessing of all Jason-1 data, as version “E”, is now complete and available for download. This release includes reprocessed data from primary, tandem, and geodetic mission phases, which spans 2002-2013 and includes repeat cycles 1-373, 500-537.[more]
04.05.2016 Perturbations on the Aviso+ FTP server on May 10th
Due to maintenance operation short interruptions of the ftp server is planned on Tuesday 10th May between 8:00 and 10:00 TU. We apologize for the inconvenience