Operational News

Operational news about Ssalto and Duacs processing system.

15.09.2017 [Jason-2] : Satellite in Safe Hold Mode since 14 September 2017 07:13:04 UTC

After 2 months of smooth operation on the Long Repeat Orbit (LRO) the Jason-2 spacecraft entered safe hold mode yesterday (Thursday, September 14th) at 07:13:04 UTC.[more]


30.08.2017 [JASON-3] Expected telemetry outage during next JA3 DEM upload

Today, Wednesday 30th of August, the most complex part of that upload will take place between 14:00UTC and 14:20UTC. During that timeframe, a telemetry outage of less than 10 minutes should be expected.[more]


28.07.2017 CNES SEF-NG disturbences

Since July 20, recurring disturbances are observed on the CNES SEF-NG file exchange service. Everything is currently being implemented to restore service. We apologize for the inconvinience.[more]


11.07.2017 Temporary unavailability of the LAS Service on July 10, 2017

For maintenance reason, the LAS Service (http://las.aviso.altimetry.fr/) has been unavailable from July 10th, 10:00 UTC until July 11th 2017 10:00 UTC.


06.07.2017 Temporary unavailability of the Bulletin Service on July 06, 2017

For maintenance reason, the Bulletin Service (http://bulletin.aviso.altimetry.fr/) is unavailable from July 06, 2017 06:00 UTC until 14:00 UTC.


27.06.2017 Temporary unavailability of the CNES ftp server on June 29, 2017

For maintenance reason, the Cnes ftp server (ftp://avisoftp.cnes.fr) will be unavailable on June 29, 2017 between 00:00 and 19:00 UTC. We apologize for the inconvenience.


22.06.2017 [L2P Sentinel-3A] Operational release of Sentinel-3A Value Added products

We are pleased to inform you that the delivery of Level-2p (L2P, also called Corrected Sea Surface Heights) and Level-3 (L3) Near-Real-Time (NRT)/ Short-Time-Critical (STC)/ Non-Time-Critical (NTC) Sentinel-3A products will enter in its operational phase on June 27th , 2017. [more]


15.06.2017 [L2P Sentinel-3A] : maintenance of the L2P software on June 19th

Due to a software maintenance, the delay delivery of L2P STC and NRT will be disrupted on June 19th between 7:00 and 16:00 UTC We are sorry for the inconvenience


20.04.2017 [SSALTO/DUACS products] redelivery of gridded geostrophic currents products on 19 and 20/04

Following the installation of the new version an anomaly has been detected in the gridded geostrophic currents delivered on 19 an 20/04.[more]


05.04.2017 [Jason-2] Nominal production in Ssalto/Duacs products

The Jason-2 mission has been reintegrated in the Ssalto/Duacs processing system[more]


Displaying results 111 to 120 out of 312