Operational News

Operational news about Ssalto and Duacs processing system.

11.09.2008 Ssalto/Duacs products updated

After the problem detected on Jason-1 the 2008/08/07, Jason-2 data was integrated in Ssalto/Duacs near-real time processing. In order to consolidate the quality of Duacs data over the past weeks,  the data were reprocessed (between the 2008/08/07 - 2008/08/29 for the gridded products and between the 2008/08/07 - 2008/09/02 for the along track products). The regional product on the Mediterranean Sea (regional-mfstep) is also concerned for the gridded and along track data. Today, all is nominal. To be regularly advice of Ssalto/Duacs updates, feel free to contact the Aviso user service (aviso@cls.fr) with "Subscribe Ssalto/Duacs updates" as subject.[more]


26.08.2008 DUACS production resumed this morning

A back up processing chain will be set in place. Click on the link for more informations...[more]


25.08.2008 SSALTO/DUACS products unavailable since 2008/08/21

The recent Jason-1 safehold mode induced a data gap in the Jason-1 altimeter data series and this gap is larger than the one allowed by the resilience of the DUACS system. The production is scheduled to be resumed this night.


22.08.2008 Jason-1 back to operational mode

- 2008/08/20 : Jason-1 mass memory has been reconfigured and the payload has been switched on. - 2008/08/22 : IGDR products are computed again from 2008/08/20 10h52 TU


19.08.2008 Jason-1 latest news

The satellite is out of safehold mode since 2008/08/13. A problem of mass memory has been detected the 2008/08/14. Investigations are ongoing on CNES and THALES sides.


14.08.2008 Jason-1 OSDR produced once again

Jason-1 OSDR are once again produced nominally. First file generated after end of safehold mode is JA1_OSD_2PcS20080813_142211_04887 produced at 17:41 (UT) on August 13.


12.08.2008 Jason-1 restarting nominally

Jason-1 is getting out of safehold mode nominally. A single event upset is probably the cause of the problem on wheel #3. Payload will be re-started on Wednesday (August 13rd), except for Doris which stayed ON. OSDR processing will begin back then, IGDR processing on August 18.


08.08.2008 Jason-1 in safehold mode

The satellite has been in BBQ mode since 2008/08/07 12:31 UT. A problem was detected on wheel number 3 at 12:31:59. Last generated products : JA1_OSD_2PcS20080807_094403_06946 First_Measurement_Time = 2008-08-07T09:44:03.723310; Last_Measurement_Time = 2008-08-07T11:39:49.557237; Analysis is ongoing


19.06.2008 [Jason-1 IGDR and GDR] now processed in version C

Jason-1 IGDR and GDR are processed in version C, beginning today (starting with data dated from 2008/06/17). Note that file names have changed (see news on 2008/06/13)


13.06.2008 [Jason-1 IGDR and GDR] Modification made for version C

Jason-1 IGDR and soon GDR will be processed in new standards (version "c"). Changes on file names will also be done.[more]


Displaying results 301 to 310 out of 312